Power plant · East Devon, England, United Kingdom

Orchard Park

Orchard Park is a cancelled power plant in East Devon, England, United Kingdom, with 5.1 MW of capacity, operated by Solstice Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at Shepherds farm, Oil Mill Lane, Clyst St Mary, EX5 1 AGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Dec 2014 (reference 14/2952/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Dec 2015 (refused, reference 14/2952/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Sept 2016 (appeal refused, reference 14/2952/MFUL, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSolstice RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area19.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7017, -3.4317DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority East Devon, reference 14/2952/MFUL)
  2. Permit refused (planning authority East Devon, reference 14/2952/MFUL)
  3. Permit applied for (planning authority East Devon, reference 14/2952/MFUL)

How it compares

Orchard Park is the 1,749th-largest of 3,430 power plants in England and the 2,731st-largest of 5,050 in the United Kingdom by capacity; its 5.1 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,749th of 3,43071,965 MW<0.1%
United Kingdom2,731st of 5,050115,622 MW<0.1%
All power plants in our data8,363rd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 1 grid connection and 1 substation, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Newlands Power Plant grid connectionGrid connection52.5 MWPlanned35 km
Axminster GSPSubstation——37 km