Power plant · Cumberland, England, United Kingdom

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine is a permitted power plant in Cumberland, England, United Kingdom, with 1 MW of capacity, operated by New Balance Athletic Shoes UK Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNew Balance Athletic Shoes Uk Limited, Flimby To Maryport, Flimby, Maryport, CA15 8RXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Jul 2024 (permit FUL/2023/0047, Town and Country Planning Act, issued by Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Mar 2023 (reference FUL/2023/0047, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Sept 2023 (refused, reference FUL/2023/0047, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Jul 2024 (appeal granted, reference FUL/2023/0047, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Jul 2024 (granted, reference FUL/2023/0047, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNew Balance Athletic Shoes UK LtdDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (1 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6783, -3.5314DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Cumberland, reference FUL/2023/0047)
  2. Permit granted (appeal granted, planning authority Cumberland, reference FUL/2023/0047)
  3. Permit refused (planning authority Cumberland, reference FUL/2023/0047)
  4. Permit applied for (planning authority Cumberland, reference FUL/2023/0047)

How it compares

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine is the 2,080th-largest of 2,174 power plants planned, permitted or under construction in England and the 3,100th-largest of 3,222 in the United Kingdom by capacity; its 1 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England2,080th of 2,174185,888 MW<0.1%
United Kingdom3,100th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,333rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 86 grid connections (46 operating, 652 MW) and 38 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Ray Lane grid connectionGrid connection4.2 MWOperating0.0 km
Eastman Site grid connectionGrid connection120 MWPlanned1.1 km
Wythegill Wind Farm grid connectionGrid connection2.3 MWOperating1.1 km
SiddickSubstation——1.8 km
StainburnSubstation——3.4 km
Stainburn & Siddick BSPSubstation——3.4 km

Operator and place

More from New Balance Athletic Shoes UK Ltd

Other power plants in England

All 5809 power plants in England, United Kingdom