Power plant · East Suffolk, England, United Kingdom
Ness Point
Ness Point is a permitted power plant in East Suffolk, England, United Kingdom, with 3 MW of capacity, operated by Conrad Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Suffolk (planning authority), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Ness Point, Gas Works Road, Lowestoft, NR32 1UZ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 28 Jan 2022 (permit DC/21/5329/FUL, Town and Country Planning Act, issued by East Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Nov 2021 (reference DC/21/5329/FUL, planning authority East Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Jan 2022 (granted, reference DC/21/5329/FUL, planning authority East Suffolk) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Conrad Energy Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Hydrogen | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.4813, 1.7652 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Ness Point is the 1,756th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,687th-largest of 3,222 in the United Kingdom by capacity; its 3 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,756th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,687th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,853rd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 2 transmission lines, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Norwich to Tilbury | Transmission line | — | Planned | 35 km |
| LionLink Interconnector | Transmission line | — | Planned | 35 km |
Operator and place
More from Conrad Energy Limited
- Burton Green Farm - Battery Energy Storage100 MW · permitted
- Armshead Farm, Armshead Road - Battery Energy Storage Facility50 MW · permitted
- South Leylodge Farmhouse, Kintore - Battery Energy Storage System49.9 MW · permitted
- Landulph Substation, Ellbridge Lane - Battery Energy Storage49.9 MW · permitted
- Larport, Clay Hill Pit - Solar Photovoltaics & Battery storage45 MW
- Torkington Road, Hazel Grove - Solar PV Panels30 MW · planned
- Gypsy Lane, Burnett - Solar PV Arrays24.5 MW
- Clayhill Farm, Greenfield Road - Battery Energy Storage20 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.