Power plant · Wyre, England, United Kingdom

Mount Pleasant Farm, Green Lane - Battery Storage

Mount Pleasant Farm, Green Lane - Battery Storage is a power plant under construction in Wyre, England, United Kingdom, with 45 MW of capacity, operated by Barton Battery Storage.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWyre (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdjacent Mount Pleasant Farm, Green Lane, Barton, PR3 0RPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date3 Oct 2023 (permit 06/2022/0763, Town and Country Planning Act, issued by Wyre)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Dec 2022 (reference 06/2022/0763, planning authority Wyre)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Oct 2023 (granted, reference 06/2022/0763, planning authority Wyre)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBarton Battery StorageDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity45 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.8537, -2.7214DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Wyre, reference 06/2022/0763)
  3. Permit applied for (planning authority Wyre, reference 06/2022/0763)

How it compares

Mount Pleasant Farm, Green Lane - Battery Storage is the 811th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,289th-largest of 3,222 in the United Kingdom by capacity; its 45 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England811th of 2,174185,888 MW<0.1%
United Kingdom1,289th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,422nd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 327 grid connections (174 operating, 1,569 MW), 251 substations, 4 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Raby's Farm grid connectionGrid connection45 MWPlanned0.4 km
Bilsborrow PV grid connectionGrid connection4.99 MWOperating2.6 km
East Irish Sea Transmission ProjectTransmission line—Planned3.4 km
Westfield Solar Farm grid connectionGrid connection4 MWOperating3.8 km
Catterall WaterworksSubstation——3.8 km
MoorsideSubstation——5.2 km
GarstangSubstation——6.8 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled18 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted24 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom