Lowick Beacon is a cancelled power plant in Westmorland and Furness, England, United Kingdom, with 4.2 MW of capacity, operated by Ecotricity.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWestmorland and Furness (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLowick Beacon (village common)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Aug 2000 (reference 5/00/2278, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Mar 2001 (refused, reference 5/00/2278, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEcotricityDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (1.4 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.2477, -3.0930DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Westmorland and Furness, reference 5/00/2278)
  2. Permit applied for (planning authority Westmorland and Furness, reference 5/00/2278)

How it compares

Lowick Beacon is the 2,319th-largest of 3,430 power plants in England and the 3,459th-largest of 5,050 in the United Kingdom by capacity; its 4.2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,319th of 3,43071,965 MW<0.1%
United Kingdom3,459th of 5,050115,622 MW<0.1%
All power plants in our data9,217th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 135 grid connections (75 operating, 1,059 MW), 74 substations, 1 gas storage facility and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Penny Bridge Solar grid connectionGrid connection30 MWPlanned1.2 km
Kirkby MoorSubstation——2.8 km
Kirkby Moor Wind Farm grid connectionGrid connection4.8 MWOperating2.8 km
Mean Moor Wind Farm grid connectionGrid connection6.9 MWOperating5.3 km
HaverthwaiteSubstation——5.5 km
UlverstonSubstation——6.3 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled39 km
East Irish Sea Transmission ProjectTransmission line—Planned47 km