Hewitts Avenue, New Waltham - Battery Storage is a permitted power plant in North East Lincolnshire, England, United Kingdom, with 49.9 MW of capacity, operated by Harmony HS Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth East Lincolnshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdjacent To YEB Sub Station Hewitts Avenue New Waltham, DN36 4RJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 Mar 2025 (permit DM/0158/24/FUL, Town and Country Planning Act, issued by North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Feb 2024 (ref. DM/0158/24/FUL, North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Mar 2025 (granted, ref. DM/0158/24/FUL, North East Lincolnshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHarmony HS LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.5389, -0.0450DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Hewitts Avenue, New Waltham - Battery Storage is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174186,088 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 227 grid connections (100 operating, 1,586 MW), 94 substations, 3 transmission lines and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 49.99 MW grid connection at Humberston BESSGrid connection50 MWPlanned0.1 km
HumberstonSubstation——0.4 km
Wesley CrescentSubstation——1.2 km
Solar 65 MW grid connection at Weelsby Farm DirectGrid connection65 MWPlanned1.8 km
Gas 1.5 MW grid connection at Convamore RoadGrid connection1.5 MWOperating2.6 km
Convamore RoadSubstation——2.6 km
Aldbrough Hydrogen StorageCO2 emitter—Planned30 km
Grimsby to WalpoleTransmission line—Planned32 km
Ossian Transmission InfrastructureTransmission line—Cancelled38 km

Operator and place

Grid connections attached to this power plant

More from Harmony HS Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page