Power plant · Shropshire, England, United Kingdom

Glovers Meadow - Ground Mounted Solar Array

Glovers Meadow - Ground Mounted Solar Array is a planned power plant in Shropshire, England, United Kingdom, with 2 MW of capacity, operated by Shropshire Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationShropshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGlovers Meadow, Maesbury Road Industrial Estate, Oswestry, SY10 8NHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Jun 2024 (reference 24/02237/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorShropshire CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8493, -3.0376DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Shropshire, reference 24/02237/FUL)

How it compares

Glovers Meadow - Ground Mounted Solar Array is the 1,849th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,806th-largest of 3,222 in the United Kingdom by capacity; its 2 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,849th of 2,174185,888 MW<0.1%
United Kingdom2,806th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,008th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 5 transmission lines and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Reinforcement to North Shropshire Electricity Distribution NetworkTransmission line—Permitted10 km
Green Gen Vyrnwy FranktonTransmission line—Planned16 km
Mid Wales Electricity Connection (N Grid)Transmission line—Cancelled17 km
nLighten ChesterData center——45 km

Operator and place

More from Shropshire Council

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page