Power plant · East Suffolk, England, United Kingdom

Glevering Park House, Glevering Estate - Solar Panels

Glevering Park House, Glevering Estate - Solar Panels is a planned power plant in East Suffolk, England, United Kingdom, with 20 MW of capacity, operated by Grupotec.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Suffolk (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressS/O Easton Lane, Glevering Park House, Glevering Estate, Wickham Market, Woodbridge, IP13 0EXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date31 Jul 2025 (reference DC/25/2997/FUL, planning authority East Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGrupotecDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area37 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1619, 1.3647DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Glevering Park House, Glevering Estate - Solar Panels is the 1,200th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,875th-largest of 3,222 in the United Kingdom by capacity; its 20 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,200th of 2,174186,088 MW<0.1%
United Kingdom1,875th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,872nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 4 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
LionLink InterconnectorTransmission line—Planned12 km
Bramford to TwinsteadTransmission line—Permitted39 km
Norwich to TilburyTransmission line—Planned46 km

Operator and place

More from Grupotec

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page