Drayton Manor Farm, Alcester Road - Solar Farm Phase 2

Drayton Manor Farm, Alcester Road - Solar Farm Phase 2 is a permitted power plant in Stratford-on-Avon, England, United Kingdom, with 32 MW of capacity, operated by Drayton Stratford.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStratford-on-Avon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressDrayton Manor Farm Alcester Road, CV37 9RQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Nov 2023 (permit 23/00039/FUL, Town and Country Planning Act, issued by Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Mar 2023 (reference 23/00039/FUL, planning authority Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Nov 2023 (granted, reference 23/00039/FUL, planning authority Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDrayton StratfordDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity32 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area40.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1955, -1.7570DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Drayton Manor Farm, Alcester Road - Solar Farm Phase 2 is the 976th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,550th-largest of 3,222 in the United Kingdom by capacity; its 32 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England976th of 2,174186,088 MW<0.1%
United Kingdom1,550th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,935th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 286 grid connections (10 operating, 86.1 MW), 16 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
The Leys Drayton Manor FM grid connectionGrid connection——0.5 km
Poplars Drayton Manor Farm grid connectionGrid connection——1.0 km
Brookside Drayton Manor FM grid connectionGrid connection——1.2 km
Evoque Data Center SolutionsData center——16 km
Ionos data center, EnglandData center——27 km
Chipping Norton PrimarySubstation——32 km
Bledington PrimarySubstation——34 km
Rissington PrimarySubstation——36 km
EE Data CentreData center——41 km