Power plant · Broadland, England, United Kingdom

Docking Farm Solar

Docking Farm Solar is a cancelled power plant in Broadland, England, United Kingdom, with 28 MW of capacity, operated by Metka EGN Projects Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBroadland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North Of The Street, Cawston, Norwich, NR10DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Feb 2022 (permit 20211249, Town and Country Planning Act, issued by Broadland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Jul 2021 (reference 20211249, planning authority Broadland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Feb 2022 (granted, reference 20211249, planning authority Broadland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMetka EGN Projects Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity28 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area35.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7930, 1.1830DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Broadland, reference 20211249)
  2. Permit applied for (planning authority Broadland, reference 20211249)

How it compares

Docking Farm Solar is the 619th-largest of 3,953 power plants in England and the 1,065th-largest of 5,723 in the United Kingdom by capacity; its 28 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England619th of 3,95385,679 MW<0.1%
United Kingdom1,065th of 5,723136,106 MW<0.1%
All power plants in our data3,262nd of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Norwich to TilburyTransmission line—Planned25 km