Power plant · South Hams, England, United Kingdom

Creacombe Solar Farm

Creacombe Solar Farm is a power plant in South Hams, England, United Kingdom, with 7.3 MW of capacity, operated by Gnaton Farm.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Hams (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCreacombe Farm, Yealmpton, Plymouth, Devon, PL8 2JADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2020DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Mar 2018 (permit 1109/17/FUL, Town and Country Planning Act, issued by South Hams)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Apr 2017 (reference 1109/17/FUL, planning authority South Hams)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Mar 2018 (granted, reference 1109/17/FUL, planning authority South Hams)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGnaton FarmDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.9 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.3334, -3.9740DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority South Hams, reference 1109/17/FUL)
  3. Permit applied for (planning authority South Hams, reference 1109/17/FUL)

How it compares

Creacombe Solar Farm is the 1,461st-largest of 3,430 power plants in England and the 2,336th-largest of 5,050 in the United Kingdom by capacity; its 7.3 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,461st of 3,43071,965 MW<0.1%
United Kingdom2,336th of 5,050115,622 MW<0.1%
All power plants in our data7,817th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 1 mine, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Tungsten WestMine——9.8 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page