Power plant · Cumberland, England, United Kingdom

Cleator Energy Storage Facility Extension

Cleator Energy Storage Facility Extension is a planned power plant in Cumberland, England, United Kingdom, with 5 MW of capacity, operated by Cleator Battery Storage Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCumberland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWoodend, CA22 2TADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Jan 2026 (reference 4/26/2022/0F1, planning authority Cumberland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCleator Battery Storage LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5039, -3.5270DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Cumberland, reference 4/26/2022/0F1)

How it compares

Cleator Energy Storage Facility Extension is the 1,613th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,484th-largest of 3,222 in the United Kingdom by capacity; its 5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,613th of 2,174185,888 MW<0.1%
United Kingdom2,484th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,616th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 86 grid connections (49 operating, 920 MW) and 37 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Cleator BESS grid connectionGrid connection15 MWPlanned0.0 km
EgremontSubstation——0.1 km
Egremont BSPSubstation——0.1 km
Whinney Hill Road grid connectionGrid connection10 MWOperating0.2 km
JT Energy Storage grid connectionGrid connection30 MWPlanned1.0 km
HensinghamSubstation——4.9 km

Operator and place

More from Cleator Battery Storage Limited

Other power plants in England

All 5809 power plants in England, United Kingdom