Power plant · Shropshire, England, United Kingdom

Cefn-Y-Maes Farm, Rhydycroesau - Solar Park

Cefn-Y-Maes Farm, Rhydycroesau - Solar Park is a cancelled solar power plant in Shropshire, England, United Kingdom, with 1.23 MW of capacity, operated by Positech Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationShropshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Greenfields Lane Cefn-y-Maes Farm Ffordd Cefn-y-Maes Rhydycroesau, SY10 7JBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Oct 2022 (permit 22/03447/FUL, Town and Country Planning Act, issued by Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Jul 2022 (reference 22/03447/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Oct 2022 (granted, reference 22/03447/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPositech Energy Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.23 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area1.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8767, -3.1285DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Shropshire, reference 22/03447/FUL)
  2. Permit applied for (planning authority Shropshire, reference 22/03447/FUL)

How it compares

Cefn-Y-Maes Farm, Rhydycroesau - Solar Park is the 3,770th-largest of 4,035 power plants in England and the 5,486th-largest of 5,834 in the United Kingdom by capacity; its 1.23 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,770th of 4,035134,434 MW<0.1%
United Kingdom5,486th of 5,834200,500 MW<0.1%
All power plants in our data15,227th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 5 transmission lines and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Green Gen Vyrnwy FranktonTransmission line—Planned16 km
Reinforcement to North Shropshire Electricity Distribution NetworkTransmission line—Permitted17 km
Mid Wales Electricity Connection (N Grid)Transmission line—Cancelled19 km
nLighten ChesterData center——43 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page