Power plant · Cornwall, England, United Kingdom

Butteriss Solar Park

Butteriss Solar Park is a cancelled power plant in Cornwall, England, United Kingdom, with 3 MW of capacity, operated by Antigua Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCornwall (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand Adjoining Butteriss Farm, Edgcumbe, Penryn, Cornwall, TR10 9EFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jan 2014 (reference PA13/11664, planning authority Cornwall)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Jan 2016 (appeal refused, reference PA13/11664, planning authority Cornwall)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Jun 2014 (refused, reference PA13/11664, planning authority Cornwall)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAntigua SolarDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.1508, -5.1964DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Cornwall, reference PA13/11664)
  2. Permit refused (planning authority Cornwall, reference PA13/11664)
  3. Permit applied for (planning authority Cornwall, reference PA13/11664)

How it compares

Butteriss Solar Park is the 2,525th-largest of 3,430 power plants in England and the 3,739th-largest of 5,050 in the United Kingdom by capacity; its 3 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,525th of 3,43071,965 MW<0.1%
United Kingdom3,739th of 5,050115,622 MW<0.1%
All power plants in our data9,677th of 12,0321,190,447 MW<0.1%