Power plant · Shropshire, England, United Kingdom
Bridge Farm, Uffington - Battery Energy Storage
Bridge Farm, Uffington - Battery Energy Storage is a permitted power plant in Shropshire, England, United Kingdom, with 8 MW of capacity, operated by Hydrock.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Shropshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | The S/O Uffington Shrewsbury, SY4 4ST | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 19 Apr 2023 (permit 23/00254/FUL, Town and Country Planning Act, issued by Shropshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 27 Jan 2023 (reference 23/00254/FUL, planning authority Shropshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 19 Apr 2023 (granted, reference 23/00254/FUL, planning authority Shropshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Hydrock | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.7142, -2.6910 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Bridge Farm, Uffington - Battery Energy Storage is the 1,529th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,371st-largest of 3,222 in the United Kingdom by capacity; its 8 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,529th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,371st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,473rd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 3 transmission lines and 3 data centers, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Reinforcement to North Shropshire Electricity Distribution Network | Transmission line | — | Permitted | 20 km |
| Mid Wales Electricity Connection (N Grid) | Transmission line | — | Cancelled | 29 km |
| Green Gen Vyrnwy Frankton | Transmission line | — | Planned | 34 km |
| Internet Central data center, England | Data center | — | — | 43 km |
| Hutchison 3G | Data center | — | — | 48 km |
| EE Data Centre | Data center | — | — | 50 km |
Operator and place
More from Hydrock
- Dragons Lane - Battery Storage Facility12 MW · permitted
- Aspley House Farm, Aspley Lane - Battery Storage Facility10 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.