Power plant · Westmorland and Furness, England, United Kingdom

Bowscar Solar Farm

Bowscar Solar Farm is a cancelled solar power plant in Westmorland and Furness, England, United Kingdom, with 5 MW of capacity, operated by Psi Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWestmorland and Furness (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North of Bowscar Road, Bowscar, Penrith, CA11 8RRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Jun 2016 (permit 15/0657, Town and Country Planning Act, issued by Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Aug 2015 (reference 15/0657, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Jun 2016 (granted, reference 15/0657, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Oct 2015 (refused, reference 15/0657, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Jun 2016 (appeal granted, reference 15/0657, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPsi Solar (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.7063, -2.7420DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Westmorland and Furness, reference 15/0657)
  3. Permit granted (appeal granted, planning authority Westmorland and Furness, reference 15/0657)
  4. Permit refused (planning authority Westmorland and Furness, reference 15/0657)
  5. Permit applied for (planning authority Westmorland and Furness, reference 15/0657)

How it compares

Bowscar is the 2,173rd-largest of 4,036 power plants in England and the 3,291st-largest of 5,837 in the United Kingdom by capacity; its 5 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,173rd of 4,036134,406 MW<0.1%
United Kingdom3,291st of 5,837200,833 MW<0.1%
All power plants in our data9,138th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 83 grid connections (37 operating, 228 MW), 47 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Greengill Farm AD grid connectionGrid connection2.4 MWOperating2.1 km
Unit 5 Cowper Road Penrith grid connectionGrid connection21.1 MWPlanned2.5 km
John Milne Avenue grid connectionGrid connection3 MWOperating4.2 km
Penrith & Shap BSPSubstation——4.8 km
Newtongate T11 & T12Substation——4.9 km
Newtongate T13Substation——4.9 km
Cross Border Connection (England)Transmission line—Planned49 km

Operator and place

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page