Power plant · Boston, England, United Kingdom

Boston Landfill, Wyberton - Solar PV Array

Boston Landfill, Wyberton - Solar PV Array is a power plant under construction in Boston, England, United Kingdom, with 9.7 MW of capacity, operated by Infinis Solar Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBoston (planning authority), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBoston Landfill, Slippery Gowt Lane, Wyberton, Boston, PE21 7AADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Jan 2022 (permit PL/0079/21, Town and Country Planning Act, issued by Boston)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date11 Jun 2021 (reference PL/0079/21, planning authority Boston)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Jan 2022 (granted, reference PL/0079/21, planning authority Boston)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinis Solar Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity9.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area17.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.9558, 0.0037DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Boston Landfill, Wyberton - Solar PV Array is the 1,505th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,330th-largest of 3,222 in the United Kingdom by capacity; its 9.7 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,505th of 2,174186,088 MW<0.1%
United Kingdom2,330th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,422nd of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 111 grid connections (2 operating, 25 MW), 5 transmission lines, 4 substations and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Boston LFG Solar grid connectionGrid connection——0.5 km
Boston ALT Energy Facility grid connectionGrid connection——1.0 km
Battery Lane BESS grid connectionGrid connection——1.5 km
Eastern Green Link 3 and Eastern Green Link 4Transmission line—Planned6.1 km
Triton Knoll Electrical SystemTransmission line—Permitted15 km
Kings Lynn B Connection ProjectTransmission line—Permitted36 km
Longmarsh Green EnergyData center—Planned39 km
South RestonSubstation——41 km
Positive ParkData center——42 km

Operator and place

More from Infinis Solar Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page