Power plant · Westmorland and Furness, England, United Kingdom

Berrier Hill Wind Farm

Berrier Hill Wind Farm is a cancelled wind power plant in Westmorland and Furness, England, United Kingdom, with 22.5 MW of capacity, operated by West Coast Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWestmorland and Furness (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNear GreystokeDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Aug 2007 (reference 07/0636, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Jan 2009 (refused, reference 07/0636, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Jun 2010 (appeal refused, reference 07/0636, planning authority Westmorland and Furness)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWest Coast Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity22.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units9 units (2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.6703, -2.9217DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Westmorland and Furness, reference 07/0636)
  2. Permit refused (planning authority Westmorland and Furness, reference 07/0636)
  3. Permit applied for (planning authority Westmorland and Furness, reference 07/0636)

How it compares

Berrier Hill is the 830th-largest of 4,035 power plants in England and the 1,382nd-largest of 5,834 in the United Kingdom by capacity; its 22.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England830th of 4,035134,434 MW<0.1%
United Kingdom1,382nd of 5,834200,500 MW<0.1%
All power plants in our data6,278th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 111 grid connections (56 operating, 713 MW) and 59 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Berrier End Farm grid connectionGrid connection15 MWPlanned2.6 km
GillsrowSubstation——5.5 km
Land to West of Town End Farm, Skelton grid connectionGrid connection5 MWPlanned5.7 km
Moss Thorn Farm, Penrith grid connectionGrid connection1.2 MWPlanned6.5 km
Skelton CSubstation——7.8 km
Newtongate T11 & T12Substation——9.5 km