Power plant · Shropshire, England, United Kingdom

Berllandeg Farm, Rhoswiel - Solar Panels

Berllandeg Farm, Rhoswiel - Solar Panels is a permitted solar power plant in Shropshire, England, United Kingdom, with 1.28 MW of capacity, operated by Igreen Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationShropshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth Of Rhoswiel Weston Rhyn, SY10 7TADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Jun 2025 (permit 25/01572/FUL, Town and Country Planning Act, issued by Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 May 2025 (reference 25/01572/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Jun 2025 (granted, reference 25/01572/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIgreen Energy (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.28 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area2.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.9192, -3.0479DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Shropshire, reference 25/01572/FUL)
  2. Permit applied for (planning authority Shropshire, reference 25/01572/FUL)

How it compares

Berllandeg Farm, Rhoswiel - Solar Panels is the 1,520th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,386th-largest of 2,548 in the United Kingdom by capacity; its 1.28 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,520th of 1,650171,264 MW<0.1%
United Kingdom2,386th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,631st of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 4 transmission lines, 3 data centers and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Reinforcement to North Shropshire Electricity Distribution NetworkTransmission line—Permitted14 km
Green Gen Vyrnwy FranktonTransmission line—Planned22 km
Mid Wales Electricity Connection (N Grid)Transmission line—Cancelled25 km
nLighten ChesterData center——37 km
Salinae Hydrogen Storage projectGas storage facility—Planned47 km
nLighten Edge Data Centre LiverpoolData center——47 km
The Babbage CentreData center——50 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page