FactValueSource
LocationSouth Norfolk (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAldeby Landfill Site, Beccles, NR34DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Apr 2022 (permit FUL/2021/0015, Town and Country Planning Act, issued by South Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Jul 2021 (reference FUL/2021/0015, planning authority South Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Apr 2022 (granted, reference FUL/2021/0015, planning authority South Norfolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorInfinis Solar Developments LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area11 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.4819, 1.6291DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority South Norfolk, reference FUL/2021/0015)
  2. Permit applied for (planning authority South Norfolk, reference FUL/2021/0015)

How it compares

Aldeby Landfill Site Solar Park is the 1,553rd-largest of 2,174 power plants planned, permitted or under construction in England and the 2,403rd-largest of 3,222 in the United Kingdom by capacity; its 7 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,553rd of 2,174185,888 MW<0.1%
United Kingdom2,403rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,515th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 2 transmission lines, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Norwich to TilburyTransmission line—Planned26 km
LionLink InterconnectorTransmission line—Planned32 km

Operator and place

More from Infinis Solar Developments Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page