Power plant · Great Yarmouth, England, United Kingdom

Admiralty Road - Battery Energy Storage Facility

Admiralty Road - Battery Energy Storage Facility is a permitted battery storage plant in Great Yarmouth, England, United Kingdom, with 50 MW of capacity, operated by Abbey Power Solution Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationGreat Yarmouth (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSouth & E/o Admiralty Road, South Denes, Great Yarmouth, NR30 3QRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Jul 2025 (permit 06/24/0123/F, Town and Country Planning Act, issued by Great Yarmouth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Apr 2024 (reference 06/24/0123/F, planning authority Great Yarmouth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Jul 2025 (granted, reference 06/24/0123/F, planning authority Great Yarmouth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAbbey Power Solution Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5864, 1.7353DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Great Yarmouth, reference 06/24/0123/F)
  2. Permit applied for (planning authority Great Yarmouth, reference 06/24/0123/F)

How it compares

Admiralty Road - Battery Energy Storage Facility is the 379th-largest of 1,650 power plants planned, permitted or under construction in England and the 690th-largest of 2,548 in the United Kingdom by capacity; its 50 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England379th of 1,650171,264 MW<0.1%
United Kingdom690th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,784th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 2 transmission lines, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Norwich to TilburyTransmission line—Planned31 km
LionLink InterconnectorTransmission line—Planned45 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page