WP Anhalt-Süd OHG 902 is a power plant in Südliches Anhalt, Saxony-Anhalt, Germany, with 18 MW of capacity, operated by Windpark Anhalt-Süd OHG.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Südliches Anhalt | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | Feldflur, 06369 Weißandt-Gölzau | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Operating | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Start year | 2004 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | Windpark Anhalt-Süd OHG | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 18 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Units | 8 units | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | wind | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Grid operator | Mitteldeutsche Netzgesellschaft Strom mbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 51.6720, 12.0511 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
WP Anhalt-Süd OHG 902 is the 168th-largest of 294 power plants in Saxony-Anhalt and the 2,048th-largest of 4,012 in Germany by capacity; its 18 MW is <0.1% of the 193,669 MW we hold for Germany. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Saxony-Anhalt | 168th of 294 | 9,806 MW | 0.18% |
| Germany | 2,048th of 4,012 | 193,669 MW | <0.1% |
| All power plants in our data | 4,321st of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 173 substations and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Umspannwerk Cösitz | Substation | — | — | 2.4 km |
| Umspannstation Radegast | Substation | — | — | 2.8 km |
| 110 kV substation (OSM way/200602167) | Substation | — | — | 9.1 km |
| European Lithium Refining and Recycling Hub Bitterfeld: from primary raw materials via recycling to critical solid state battery components | Processing plant | — | — | 14 km |
Operator, grid operator and place
Other power plants in Saxony-Anhalt
- Schkopau900 MW
- Heizkraftwerk Dieselstraße173 MW
- WP Vier Berge151 MW
- Mercer Stendal TG140 MW
- Großkayna137 MW
- Windpark Hüselitz123 MW
- Schinne II117 MW
- Bornstedt-Rottmersleben115 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.