Power plant · Pattensen, Lower Saxony, Germany
Schulenburg REP
Schulenburg REP is a planned power plant in Pattensen, Lower Saxony, Germany, with 14.4 MW of capacity, operated by Windpark Schulenburg REP GmbH & Co. KG.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Pattensen | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | 30982 Pattensen | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Planned | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | Windpark Schulenburg REP GmbH & Co. KG | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 14.4 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Units | 2 units | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | wind | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Grid operator | Avacon Netz GmbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 52.1951, 9.7435 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Schulenburg REP is the 273rd-largest of 383 power plants planned, permitted or under construction in Lower Saxony and the 1,470th-largest of 2,173 in Germany by capacity; its 14.4 MW is <0.1% of the 78,152 MW of power plants planned, permitted or under construction we hold for Germany. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Lower Saxony | 273rd of 383 | 10,881 MW | 0.13% |
| Germany | 1,470th of 2,173 | 78,152 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,509th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 132 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Nordstemmen | Substation | — | — | 5.2 km |
| Gestorf | Substation | — | — | 5.2 km |
| Sarstedt | Substation | — | — | 11 km |
| PoP-Hauptverteiler | Data center | — | — | 16 km |
| PoP-Hauptverteiler | Data center | — | — | 18 km |
| PoP Hauptverteiler | Data center | — | — | 18 km |
Operator, grid operator and place
More from Windpark Schulenburg REP GmbH & Co. KG
- Schulenburg Repowering I14.4 MW · planned
Other power plants in Lower Saxony
- Emsland1,645 MW
- Grohnde1,360 MW
- Emsland A1,336 MW
- Kraftwerk Wilhelmshaven Onyx726 MW
- Wilhelmshaven 1 DT715 MW
- KWM Block 3690 MW
- Kraftwerk Emden Dampfturbine433 MW
- Kraftwerk Landesbergen Dampfturbine431 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.