Owner · Company
Integrum Renewable Energy Limited
Integrum Renewable Energy Limited operates 8 power plants in the United Kingdom. It has 4 subsidiaries in the data, linked to 5 assets and rights.
Portfolio
The 8 assets and rights Integrum Renewable Energy Limited owns, operates or holds, by class, with its role in each, across its 7 records. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 8
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Bungalow Farm, Smeaton Lane - Battery Energy Storage | Rugby, England, United Kingdom | Operator | 60 MW |
| Bungalow Farm, Smeaton Lane - Battery Energy Storage System | Rugby, England, United Kingdom | Operator | 60 MW |
| Vicarage Farm - Battery Energy Storage System | North Northamptonshire, England, United Kingdom | Operator | 50 MW |
| Osgodby Grange, Osgodby - Solar Energy | North Yorkshire, England, United Kingdom | Operator | 49.9 MW |
| Firsfield Solar Farm | West Suffolk, England, United Kingdom | Operator | 46.9 MW |
| Landown Farm, Bakeacre Lane - Battery Energy Storage System | South Derbyshire, England, United Kingdom | Operator | 40 MW |
| Lodge Farm, Calow - Battery Energy Storage System | North East Derbyshire, England, United Kingdom | Operator | 25 MW |
| West Thorpe Church Farm, Willoughby On The Wolds - Battery Energy Storage | Rushcliffe, England, United Kingdom | Operator | 25 MW |
By country
Where the assets and rights are.
- The United Kingdom8 power plants
Latest events
Dated events about Integrum Renewable Energy Limited and its assets from official notices and registers, newest first: the latest 8 of 14. All recent changes.
- Permit refused: Vicarage Farm - Battery Energy Storage System (planning authority North Northamptonshire, reference NW/25/00405/FUL)
- Permit applied for: Vicarage Farm - Battery Energy Storage System (planning authority North Northamptonshire, reference NW/25/00405/FUL)
- Permit granted: Lodge Farm, Calow - Battery Energy Storage System (planning authority North East Derbyshire, reference 24/01034/MFL)
- Permit granted: Landown Farm, Bakeacre Lane - Battery Energy Storage System (planning authority South Derbyshire, reference DMPA/2024/1639)
- Permit applied for: Bungalow Farm, Smeaton Lane - Battery Energy Storage (planning authority Rugby, reference R24/1166)
- Permit applied for: Bungalow Farm, Smeaton Lane - Battery Energy Storage System (planning authority Rugby, reference R24/1166)
- Permit applied for: Landown Farm, Bakeacre Lane - Battery Energy Storage System (planning authority South Derbyshire, reference DMPA/2024/1639)
- Permit applied for: Lodge Farm, Calow - Battery Energy Storage System (planning authority North East Derbyshire, reference 24/01034/MFL)
Group
Subsidiaries
4 companies under Integrum Renewable Energy Limited, direct and through other subsidiaries.
| Subsidiary | Held through | Share | Assets and rights |
|---|---|---|---|
| Enray SPV 241491 Limited | Direct | — | 1 |
| Integrum SPV 21014 Limited | Direct | — | 2 |
| Integrum SPV 22298 Limited | Direct | — | 1 |
| Integrum SPV 23101 Limited | Direct | — | 1 |
Subsidiaries' portfolio
5 assets and rights across the subsidiaries, each counted once. This total is apart from the portfolio above; together, the group links to 13.
- Power plants5
Facts
| Fact | Value | Source |
|---|---|---|
| Location | England | Companies House bulk company data · record · OGL v3 · checked 24 Oct 2026 |
| Location | United Kingdom | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| LEI | 875500X5WBMQOSWQJY04 | Rare Context entity resolution · record · CC0 1.0 · checked 24 Oct 2026 |
| LEI | 875500X5WBMQOSWQJY04 | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| Company number | 13052159 | Companies House bulk company data · record · OGL v3 · checked 24 Oct 2026 |
| Company number | 13052159 | GLEIF LEI · record · CC0 1.0 · checked 24 Oct 2026 |
| Register status | Active | Companies House bulk company data · record · OGL v3 · checked 24 Oct 2026 |
| Company type | Private Limited Company | Companies House bulk company data · record · OGL v3 · checked 24 Oct 2026 |
| Incorporated | 30 Nov 2020 | Companies House bulk company data · record · OGL v3 · checked 24 Oct 2026 |
| Industry (SIC) | 42220 - Construction of utility projects for electricity and telecommunications, 71129 - Other engineering activities | Companies House bulk company data · record · OGL v3 · checked 24 Oct 2026 |
Also recorded as
Sources name Integrum Renewable Energy Limited under 7 records; this page joins them. Links to any of them lead here.
| Name in the source | Identifier | Source |
|---|---|---|
| ENRAY POWER LTD | party:company-number:gb-13052159 | Companies House bulk company data |
| ENRAY POWER LTD | party:lei:875500X5WBMQOSWQJY04 | GLEIF LEI |
| Integrum Renewable Energy Limited | party:name:integrum-renewable-energy-limited | DESNZ Renewable Energy Planning Database (REPD) |
| Enray Power Limited | party:name:enray-power-limited | DESNZ Renewable Energy Planning Database (REPD) |
| Enray Power | party:name:enray-power | DESNZ Renewable Energy Planning Database (REPD) |
| ENRAY POWER LTD | party:name:enray-power-ltd | NGED Connected Data portal |
| INTEGRUM RENEWABLE ENERGY LTD | party:name:integrum-renewable-energy-ltd | NGED Connected Data portal |
Research on Integrum Renewable Energy Limited.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. Companies House bulk company data, OGL v3.
- Companies House PSC snapshot. Companies House PSC snapshot, Free, unsupported daily snapshot.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- GLEIF LEI. GLEIF LEI, CC0 1.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.