Cedar Holdco LLC
Cedar Holdco LLC holds 8 grid connections in the United States.
Portfolio
The 8 assets and rights Cedar Holdco LLC owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Grid connections 8
| Grid connection | Location | Role | Capacity |
|---|---|---|---|
| Bristers 500 kV grid connection (PJM C01-1884) | Fauquier County, Virginia, United States | Holder | 1,000 MW |
| Ohio Central 345 kV grid connection (PJM C01-1886) | Muskingum County, Ohio, United States | Holder | 1,000 MW |
| Dickerson - Quince Orchard 230 kV grid connection (PJM C01-1885) | Montgomery County, Maryland, United States | Holder | 500 MW |
| East Flemington 230 kV grid connection (PJM C01-1875) | Hunterdon County, New Jersey, United States | Holder | 500 MW |
| Hamilton 230 kV grid connection (PJM C01-1882) | Loudoun County, Virginia, United States | Holder | 500 MW |
| Wythe 138 kV grid connection (PJM C01-1879) | Wythe County, Virginia, United States | Holder | 300 MW |
| Carrollton 138 kV grid connection (PJM C01-1878) | Carroll County, Ohio, United States | Holder | 250 MW |
| Strasburg 138 kV grid connection (PJM C01-1876) | Tuscarawas County, Ohio, United States | Holder | 250 MW |
By country
Where the assets and rights are.
- The United States8 grid connections
Partners and counterparties
Owners, operators and grid operators on the same assets.
- PJM Interconnection, L.L.C.8 shared