AmeyCespa operates 4 power plants in the United Kingdom.

Portfolio

The 4 assets and rights AmeyCespa owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.

Power plants 4

Power plantLocationRoleCapacity
Allerton Waste Recovery Park (EfW)North Yorkshire, England, United KingdomOperator27 MW
Milton Keynes Waste Recovery ParkMilton Keynes, England, United KingdomOperator7 MW
Isle of Wight Waste Recovery ParkIsle of Wight, England, United KingdomOperator3.3 MW
Allerton Waste Recovery Park (Waste AD)North Yorkshire, England, United KingdomOperator1.1 MW

By country

Where the assets and rights are.

Latest events

Dated events about AmeyCespa and its assets from official notices and registers, newest first: the latest 8 of 12. All recent changes.

  1. Commissioned: Allerton Waste Recovery Park (Waste AD)
  2. Commissioned: Allerton Waste Recovery Park (EfW)
  3. Commissioned: Milton Keynes Waste Recovery Park
  4. Construction started: Isle of Wight Waste Recovery Park
  5. Permit granted: Isle of Wight Waste Recovery Park (planning authority Isle of Wight, reference P/01376/15)
  6. Permit applied for: Isle of Wight Waste Recovery Park (planning authority Isle of Wight, reference P/01376/15)
  7. Permit granted: Milton Keynes Waste Recovery Park (planning authority Milton Keynes, reference 13/00861/FULEIS)
  8. Permit applied for: Milton Keynes Waste Recovery Park (planning authority Milton Keynes, reference 13/00861/FULEIS)