Netcongestie · Flevoland

Netcongestie in Flevoland (grid congestion in Flevoland)

The capaciteitskaart gives a congestion status for offtake and feed-in to 15 supply areas and 9 substations in Flevoland; Rare Context holds those statuses, available on request. Flevoland has 32 high-voltage substations in the data, 3 of them at 220 or 380 kV.

We hold the netcongestie status for Flevoland.Offtake and feed-in status per supply area and substation, with the grid operator: available on request.

What netcongestie means

Netcongestie (grid congestion) means the grid in an area is full: the operator cannot promise new capacity for offtake (drawing power, for a factory, a data center or a heat pump cluster) or for feed-in (supplying power, from solar, wind or a battery) until it reinforces the grid. The Dutch grid operators publish a status per area on one map, the capaciteitskaart of Netbeheer Nederland, for offtake and for feed-in apart: room available, limited room, or a waiting list.

Hoogspanningsstations in Flevoland

Every high-voltage substation in Flevoland we hold, highest voltage first. Voltage and operator come from OpenStreetMap; the congestion status from the capaciteitskaart, on request.

Substations in Flevoland

Supply areas (voedingsgebieden)

The 15 supply areas of the regional grid operators and TenneT congestion areas in Flevoland that the map gives a status. Their statuses are available on request; the official map shows them for one address at a time.

Data on this page