Substation · Dronten, Flevoland, Netherlands

Hoogspanningsstation Kubbetocht (Kubbetocht substation)

Hoogspanningsstation Kubbetocht is a 150 kV substation in Dronten, Flevoland, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFlevolandOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationDronten (point in boundary)PDOK Bestuurlijke Gebieden (Kadaster) · CC BY 4.0 · checked 25 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.4505, 5.5947OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 814 permit notices, 334 power plants (268 operating, 5,088 MW), 44 CO2 emitters (27 operating), 37 data centers, 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Biomass Biddinghuizen (De Torenhoeve Biogas)Power plant3.92 MWOperating2.7 km
Green gas Biddinghuizen (De Torenhoeve Biogas)CO2 emitter—Operating2.7 km
Windpark Zeebiestocht IIPower plant22.4 MWOperating2.7 km
Wind omgevingsvergunning draft decision, Zeewolde (gmb-2026-173382)Permit notice——5.2 km
Windpark XY WindPower plant33.8 MWOperating5.2 km
Energiepark BiddinghuizenCO2 emitter—Operating5.9 km
Nitrogen natuurvergunning application, Dronten (prb-2025-18469)Permit notice——8.5 km
Nitrogen natuurvergunning application, Lelystad (prb-2026-5456)Permit notice——8.6 km
Biomass heat Lelystad (Primco BMC Lelystad)CO2 emitter—Operating9.3 km

Operator and place

More from TenneT

Candidate sites around this substation

31 sites of land near 150 kV Kubbetocht have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

All sites in Flevoland

Other substations in Flevoland

All 32 substations in Flevoland, Netherlands

Data on this page