Netcongestie · Drenthe

Netcongestie in Drenthe (grid congestion in Drenthe)

The capaciteitskaart gives a congestion status for offtake and feed-in to 7 supply areas and 9 substations in Drenthe; Rare Context holds those statuses, available on request. Drenthe has 31 high-voltage substations in the data, 1 of them at 220 or 380 kV.

We hold the netcongestie status for Drenthe.Offtake and feed-in status per supply area and substation, with the grid operator: available on request.

What netcongestie means

Netcongestie (grid congestion) means the grid in an area is full: the operator cannot promise new capacity for offtake (drawing power, for a factory, a data center or a heat pump cluster) or for feed-in (supplying power, from solar, wind or a battery) until it reinforces the grid. The Dutch grid operators publish a status per area on one map, the capaciteitskaart of Netbeheer Nederland, for offtake and for feed-in apart: room available, limited room, or a waiting list.

Hoogspanningsstations in Drenthe

Every high-voltage substation in Drenthe we hold, highest voltage first. Voltage and operator come from OpenStreetMap; the congestion status from the capaciteitskaart, on request.

Substations in Drenthe

Supply areas (voedingsgebieden)

The 7 supply areas of the regional grid operators and TenneT congestion areas in Drenthe that the map gives a status. Their statuses are available on request; the official map shows them for one address at a time.

Data on this page