Substation · Drenthe, Netherlands

110 kV Assen Marsdijk

110 kV Assen Marsdijk is a substation in Drenthe, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDrentheOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates53.0137, 6.5820OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 405 permit notices, 331 power plants (273 operating, 6,033 MW), 31 CO2 emitters (19 operating) and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Assen (re-z beheer)Power plant1.36 MWOperating1.1 km
Solar Assen (ZP Assen-Zuid)Power plant21.1 MWOperating1.8 km
Nitrogen natuurvergunning application, Tynaarlo (prb-2025-17090)Permit notice——3.1 km
Solarpark 'de Lichtkiem'Power plant4.44 MWOperating3.6 km
Battery storage omgevingsvergunning application, Assen (gmb-2025-106644)Permit notice——4.4 km
Substation omgevingsvergunning decision, Assen (prb-2026-12447)Permit notice——4.8 km
Biomass heat Zuidvelde (Ankehaar Holding)CO2 emitter—Operating7.6 km
Green gas Beilen (Green Create Wijster)CO2 emitter—Operating16 km
Electric boiler Gasselternijveen (Coöperatie Avebe)CO2 emitter—Operating19 km

Operator and place

More from TenneT

Candidate sites around this substation

8 sites of land near 110 kV Assen Marsdijk have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in Drenthe

All 31 substations in Drenthe, Netherlands

Data on this page