Grid connection · Matagorda County, Texas, United States

Bluefox Solar 3 grid connection (ERCOT 28INR0064)

Bluefox Solar 3 grid connection (ERCOT 28INR0064) is a planned grid connection in Matagorda County, Texas, United States, with 202 MW of capacity, held by Industrial November Project LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMatagorda County (connects at #8754 Zoisite 345kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (screening study completed, full interconnection study started, no interconnection agreement)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderIndustrial November Project LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity202 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolarERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date22 Mar 2024ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date18 Apr 2030 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue (the day the screening study started)

How it compares

Bluefox Solar 3 grid connection (ERCOT 28INR0064) is the 809th-largest of 1,710 grid connections in Texas and the 1,478th-largest of 4,021 in the United States by capacity; its 202 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas809th of 1,710438,874 MW<0.1%
United States1,478th of 4,021923,876 MW<0.1%
All grid connections in our data1,799th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Due to connect

Holder, grid operator and place

More from Industrial November Project LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States