Grid connection · Matagorda County, Texas, United States

Bluefox Solar 2 grid connection (Ercot 28INR0063)

Bluefox Solar 2 grid connection (Ercot 28INR0063) is a planned grid connection in Matagorda County, Texas, United States, with 402 MW of capacity, held by Industrial November Project LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceBluefox Solar 2 grid connection (ERCOT 28INR0063)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
LocationMatagorda County (connects at #8754 Zoisite 345kV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
StatusPlanned (SS completed, FIS started, no IA)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
HolderIndustrial November Project LLCERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Capacity402 MWERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
TechnologySolar (registered as SOL/PV)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Grid operatorElectric Reliability Council of Texas, Inc.ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Queue date22 Mar 2024ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026
Connection date17 Jan 2030 (proposed)ERCOT GIS report · ERCOT Terms of Use · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Bluefox Solar 2 grid connection (Ercot 28INR0063) is the 262nd-largest of 1,710 grid connections in Texas and the 472nd-largest of 3,711 in the United States by capacity; its 402 MW is <0.1% of the 833,233 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Texas262nd of 1,710438,874 MW<0.1%
United States472nd of 3,711833,233 MW<0.1%
All grid connections in our data775th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Holder, grid operator and place

More from Industrial November Project LLC

Other grid connections in Texas

All 1874 grid connections in Texas, United States