Grid connection · Maricopa County, Arizona, United States

Agua Caliente Solar 2 grid connection (CAISO 1222)

Agua Caliente Solar 2 grid connection (CAISO 1222) is a planned grid connection in Maricopa County, Arizona, United States, with 20 MW of capacity, connected by California Independent System Operator Corporation.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceAGUA CALIENTE SOLAR 2 grid connection (CAISO 1222)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
LocationMaricopa County (connects at Hoodoo Wash Switchyard 500 kV)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
StatusPlanned (active, cluster ISP)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Capacity20 MWCAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
TechnologySolar (registered as Photovoltaic Solar)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Grid operatorCalifornia Independent System Operator CorporationCAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Queue date8 Mar 2016CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026
Connection date1 Dec 2016 (proposed)CAISO queue report · CAISO Privacy and Terms of Use · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection from official notices and registers, newest first. All recent changes.

  1. Entered the connection queue

How it compares

Agua Caliente Solar 2 grid connection (CAISO 1222) is the 26th-largest of 26 grid connections in Arizona and the 3,596th-largest of 4,021 in the United States by capacity; its 20 MW is <0.1% of the 923,876 MW we hold for the United States. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Arizona26th of 2613,740 MW0.15%
United States3,596th of 4,021923,876 MW<0.1%
All grid connections in our data5,244th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Was due to connect; the register does not list it as connected

Grid operator and place

More from California Independent System Operator Corporation

Other grid connections in Arizona

All 26 grid connections in Arizona, United States