Grid connection · the United Kingdom

STAGE 3 grid connection

STAGE 3 grid connection is a grid connection in the United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Queue dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates51.5624, -2.4845NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 474 power plants (182 operating, 2,018 MW), 47 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Green FarmPower plant9.4 MWCancelled0.4 km
Larks Lane & Latteridge Lane, Latteridge - Battery Storage FacilityPower plant49.9 MWPermitted0.6 km
Iron Acton Substation, Latteridge Lane - Battery Energy Storage SystemPower plant99 MWPermitted0.7 km
Alderton PrimarySubstation——18 km
Yatton Keynell PrimarySubstation——23 km
Spring Quarry West PrimarySubstation——24 km
Hinkley Point C ConnectionTransmission line—Permitted32 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned35 km

Place

Other grid connections in United Kingdom

All 5913 grid connections in the United Kingdom

Data on this page