Grid connection · the United Kingdom
Q PARK grid connection
Q PARK grid connection is a grid connection in the United Kingdom.
We hold more on this right.Capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Technology | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 51.7165, -2.2304 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 405 power plants (159 operating, 2,065 MW), 62 substations and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Windmill Hill | Power plant | 1.5 MW | Cancelled | 2.5 km |
| Lynch Knoll Wind Farm (Extension) | Power plant | 1.5 MW | Cancelled | 2.8 km |
| Fawkes 1 | Power plant | 4.7 MW | Cancelled | 5.5 km |
| Tetbury Primary | Substation | — | — | 10 km |
| Kemble RAF Primary | Substation | — | — | 13 km |
| Malmesbury Primary | Substation | — | — | 17 km |
| DXC Technology | Data center | — | — | 25 km |
| nLighten Bristol | Data center | — | — | 31 km |
| Nationwide Swindon Technology Centre | Data center | — | — | 32 km |
Place
Other grid connections in United Kingdom
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.