Grid connection · England, United Kingdom

Spring Lane BESS grid connection

Spring Lane BESS grid connection is a grid connection in England, United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSPRING LANE BESS grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Queue dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates52.9931, -1.0755NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 489 power plants (158 operating, 1,486 MW), 30 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Gedling Solar FarmPower plant5.7 MWOperating0.4 km
Burton Wood Farm, Spring Lane - Battery Energy StoragePower plant320 MWPermitted0.4 km
Gedling Colliery ADPower plant3 MWCancelled0.8 km
Weston Marsh to East LeicestershireTransmission line—Planned23 km
Chesterfield to WillingtonTransmission line—Planned25 km
Kiveton ParkSubstation——40 km
CosthorpeSubstation——42 km
DronfieldSubstation——43 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom