Grid connection · England, United Kingdom

Mererid Offshore Wind Farm grid connection

Mererid Offshore Wind Farm grid connection is a planned grid connection in England, United Kingdom, with 1,008 MW of capacity, held by South West Wind Holdco Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Alverdiscott 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderSouth West Wind Holdco LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toMererid Offshore Wind FarmNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,008 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date6 Dec 2036NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Mererid Offshore Wind Farm grid connection is the 74th-largest of 2,533 grid connections in England and the 112th-largest of 3,903 in the United Kingdom by capacity; its 1,008 MW is 0.23% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England74th of 2,533319,370 MW0.32%
United Kingdom112th of 3,903446,745 MW0.23%
All grid connections in our data211th of 7,6161,281,251 MW<0.1%

Holder, grid operator and place

More from South West Wind Holdco Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page