Grid connection · England, United Kingdom

Gresley Power Ltd grid connection

Gresley Power Ltd grid connection is a grid connection in England, United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceGRESLEY POWER LTD grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates52.7583, -1.5915NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 515 power plants (150 operating, 1,255 MW), 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Mount Road, Castle Gresley - Battery Storage FacilityPower plant20 MWPermitted0.1 km
Land at Coton Park CollieryPower plant2.5 MWOperating0.2 km
Breach Farm - Energy BarnPower plant40 MWPermitted1.4 km
Data center, England (OSM way 710050084)Data center——28 km
Chesterfield to WillingtonTransmission line—Planned32 km
Santander data center, EnglandData center——32 km
Santander data center, EnglandData center——33 km
Weston Marsh to East LeicestershireTransmission line—Planned43 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page