Grid connection · England, United Kingdom
Furzen Solar grid connection
Furzen Solar grid connection is a grid connection in England, United Kingdom.
We hold more on this right.Capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | FURZEN SOLAR grid connection | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Technology | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Queue date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 51.9279, -0.9110 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 418 power plants (149 operating, 1,892 MW), 87 substations and 46 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| East Claydon GSP | Substation | — | — | 0.2 km |
| East Claydon Substation, East Claydon Road - Energy Storage | Power plant | 500 MW | Planned | 0.7 km |
| Tuckey Farm | Power plant | 25 MW | Permitted | 0.8 km |
| East Claydon Battery Energy Storage | Power plant | 500 MW | Permitted | 1.2 km |
| Data center, England (OSM way 1254986167) | Data center | — | — | 7.7 km |
| nLighten Milton Keynes | Data center | — | — | 14 km |
| Bicester North BSP | Substation | — | — | 15 km |
| Bicester North Primary | Substation | — | — | 15 km |
| Data center, England (OSM way 460010263) | Data center | — | — | 18 km |
Place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.