Grid connection · England, United Kingdom

Facility at Incinerator Road grid connection

Facility at Incinerator Road grid connection is a grid connection in England, United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceFACILITY AT INCINERATOR ROAD grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Queue dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates52.9460, -1.1352NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 470 power plants (162 operating, 1,351 MW), 14 substations, 6 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Eastcroft EfW (Lines 1 & 2)Power plant9 MWOperating0.2 km
Eastcroft EfW (3rd Line)Power plant3 MWPermitted0.2 km
Nottingham University - WindPower plant5 MWCancelled3.6 km
ExperianData center——7.4 km
nLighten NottinghamData center——8.6 km
Weston Marsh to East LeicestershireTransmission line—Planned21 km
Chesterfield to WillingtonTransmission line—Planned23 km
Digital Space DC - NewarkData center——27 km
Kiveton ParkSubstation——44 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page