Grid connection · England, United Kingdom
Eakring Solar Farm, North Laithes Farm, Wellow Road, Eakring, NOTTS, NG22 0AN grid connection
Eakring Solar Farm, North Laithes Farm, Wellow Road, Eakring, NOTTS, NG22 0AN grid connection is a grid connection in England, United Kingdom.
We hold more on this right.Attached to, capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | EAKRING SOLAR FARM, NORTH LAITHES FARM, WELLOW ROAD, EAKRING, NOTTS, NG22 0AN grid connection | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Attached to | Available on request | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Technology | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 53.1690, -1.0050 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 483 power plants (144 operating, 1,404 MW), 113 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Eakring Solar Farm | Power plant | 11.9 MW | Operating | 1.6 km |
| Stud Farm, Rufford (Farm AD) | Power plant | 2.2 MW | Operating | 1.8 km |
| Stonish Hill (Bilsthorpe) | Power plant | 10.3 MW | Operating | 2.0 km |
| Digital Space DC - Newark | Data center | — | — | 17 km |
| nLighten Nottingham | Data center | — | — | 23 km |
| Costhorpe | Substation | — | — | 24 km |
| Kiveton Park | Substation | — | — | 25 km |
| Stow | Substation | — | — | 27 km |
| Chesterfield to Willington | Transmission line | — | Planned | 33 km |
Place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.