Grid connection · England, United Kingdom

Battery storage 99.9 MW grid connection at Chesterfield 132Kv S Stn

Battery storage 99.9 MW grid connection at Chesterfield 132Kv S Stn is a grid connection in England, United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Queue dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates53.2221, -1.3827NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 440 power plants (143 operating, 1,230 MW), 134 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hasland Photovoltaic Solar ParkPower plant49.9 MWPermitted0.6 km
Calow Green FarmPower plant20 MWOperating0.8 km
Land To The East Of Back LanePower plant5 MWOperating1.0 km
DronfieldSubstation——10 km
JordanthorpeSubstation——13 km
GreenhillSubstation——13 km
Hive ITData center——18 km
UoS IT ServicesData center——19 km
Chesterfield to WillingtonTransmission line—Planned21 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page