| Fact | Value | Source |
|---|---|---|
| Name in the source | AMAZON BRS1 grid connection | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Technology | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Queue date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 51.5415, -2.6414 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 496 power plants (188 operating, 1,928 MW), 30 substations, 11 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Central Park - Solar Farm & Battery Storage | Power plant | 7 MW | Planned | 0.1 km |
| Central Avenue, Severn Beach - Solar Photovoltaic Panels | Power plant | 1.5 MW | Permitted | 0.2 km |
| The Range Distribution Centre, Severn Beach - Solar panels | Power plant | 2.4 MW | Permitted | 0.7 km |
| nLighten Bristol | Data center | — | — | 4.1 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 25 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 26 km |
| Vantage Data Centers - CWL13 | Data center | — | — | 27 km |
| Vantage Data Centers data center, Newport | Data center | — | — | 27 km |
| Alderton Primary | Substation | — | — | 29 km |
Place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.