Grid connection · the United Kingdom

Eign WWTW grid connection

Eign WWTW grid connection is a grid connection in the United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, location, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceEIGN WWTW grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates52.0517, -2.7042NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 200 power plants (58 operating, 608 MW), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Perserverance RoadPower plant20 MWPermitted2.2 km
Larport, Clay Hill Pit - Solar Photovoltaics & Battery storagePower plant45 MWOperating5.6 km
Westhide Solar FarmPower plant34.6 MWCancelled5.6 km

Place

Other grid connections in United Kingdom

All 5913 grid connections in the United Kingdom

Data on this page