Grid connection · the United Kingdom

Cheltenham General Hospital grid connection

Cheltenham General Hospital grid connection is a grid connection in the United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCHELTENHAM GENERAL HOSPITAL grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates51.8921, -2.0719NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 343 power plants (123 operating, 1,742 MW), 58 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cheltenham General Hospital - Battery Energy Storage SystemPower plant2.19 MWPermitted0.2 km
Home FarmPower plant6.7 MWOperating5.0 km
Hayden Hill Fruit FarmPower plant5 MWCancelled5.1 km
Shipton Oliffe PrimarySubstation——9.0 km
Northleach PrimarySubstation——17 km
Whiteway PrimarySubstation——20 km
DXC TechnologyData center——29 km
Ionos data center, EnglandData center——35 km
Nationwide Swindon Technology CentreData center——39 km

Place

Other grid connections in United Kingdom

All 5913 grid connections in the United Kingdom