Grid connection · the United Kingdom
Candles Landfill grid connection
Candles Landfill grid connection is a grid connection in the United Kingdom.
We hold more on this right.Capacity, connection date, grid operator, holder, location, status and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | CANDLES LANDFILL grid connection | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 52.6631, -2.4994 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 273 power plants (84 operating, 804 MW), 3 transmission lines and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Candles/Coalmoor Landfill | Power plant | 2.9 MW | Operating | 0.4 km |
| Steeraway Farm - Solar Farm | Power plant | 30 MW | Under construction | 2.4 km |
| New Works Lane - Solar Farm | Power plant | 30 MW | Planned | 2.6 km |
| Reinforcement to North Shropshire Electricity Distribution Network | Transmission line | — | Permitted | 33 km |
| Hutchison 3G | Data center | — | — | 34 km |
| EE Data Centre | Data center | — | — | 36 km |
| Internet Central data center, England | Data center | — | — | 41 km |
| Mid Wales Electricity Connection (N Grid) | Transmission line | — | Cancelled | 42 km |
| Green Gen Vyrnwy Frankton | Transmission line | — | Planned | 47 km |
Place
Other grid connections in United Kingdom
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.