Data center · Somerset County, New Jersey, United States
CyrusOne data center, Somerset
CyrusOne data center, Somerset is a data center in Somerset County, New Jersey, United States, with a 28,567 m² building, operated by CyrusOne LLC.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Somerset County, New Jersey | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 800 Cottontail Lane, Somerset, NJ 08873 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | CyrusOne LLC | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://www.cyrusone.com/data-centers/north-america/somerset-nj | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 28,567 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 40.5380, -74.5457 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
CyrusOne LLC operates 32 of the 1,336 data centers in the United States in our data with a named owner; 9 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| CyrusOne LLC | 10th | 32 | 2.4% |
Nearby
Within 50 km of this data center: 11 power plants (9,757 MW), 3 mines and 2 AI supercomputers, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Kingston Quarry | Mine | — | Operating | 18 km |
| Woodbridge Energy Center | Power plant | 773 MW | Operating | 19 km |
| Red Oak Power LLC | Power plant | 821 MW | Operating | 19 km |
| Princeton Della Phase 1 | AI supercomputer | 100 H100e | Operating | 22 km |
| Princeton Della Phase 2 | AI supercomputer | 396 H100e | Operating | 22 km |
| Tilcon NY-Perth Amboy Sand | Mine | — | Operating | 24 km |
| Sewaren | Power plant | 610 MW | Operating | 25 km |
| Mount Hope Quarry | Mine | — | Operating | 42 km |
Operator and place
More from CyrusOne LLC
- CyrusOne Amsterdam I54 MW
- CyrusOne FRA 4data center
- CyrusOne FRA1data center
- CyrusOne LON2data center
- CyrusOne FRA2data center
- CyrusOne London 1data center
- CyrusOne LON3data center
- CryrusOne LON4data center
Other data centers in New Jersey
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.