Data center · Douglas County, Georgia, United States
Atlanta III
Atlanta III is a data center in Douglas County, Georgia, United States, operated by T5 Data Centers.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Douglas County, Georgia | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 1546 Trae Lane, Lithia Springs, GA 30122 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | T5 Data Centers | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 44,684 m² (building, 4 buildings) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 33.7589, -84.6068 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
T5 Data Centers operates 3 of the 1,336 data centers in the United States in our data with a named owner; 43 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| T5 Data Centers | 44th | 3 | 0.22% |
Nearby
Within 50 km of this data center: 6 mines (5 operating) and 2 power plants (3,656 MW), measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Jack McDonough | Power plant | 2,848 MW | Operating | 14 km |
| Luck Stone Atlanta Stephens Plant | Mine | — | Operating | 23 km |
| Kennesaw Quarry | Mine | — | Operating | 29 km |
| Black Lake | Mine | — | Closed | 33 km |
| Yates | Power plant | 807 MW | Operating | 43 km |
Operator and place
More from T5 Data Centers
- T5 Chicago IIdata center
- T5@Clevelanddata center
Other data centers in Georgia
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.