Data center · Alameda County, California, United States
Hurricane Electric Fremont 1
Hurricane Electric Fremont 1 is a data center in Alameda County, California, United States, operated by Hurricane Electric.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Alameda County, California | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 760 Mission Court, Fremont, CA 94539 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Hurricane Electric | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 3,131 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 37.4899, -121.9311 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Hurricane Electric operates 2 of the 1,336 data centers in the United States in our data with a named owner; 58 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| Hurricane Electric | 59th | 2 | 0.15% |
Nearby
Within 50 km of this data center: 18 water rights (4 active), 4 AI supercomputers, 4 power plants (2 operating, 1,290 MW) and 3 mines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Sheridan Quarry | Mine | — | Operating | 8.4 km |
| Condor Galaxy 1 (CG-1) | AI supercomputer | 243 H100e | Operating | 13 km |
| Arroyo Valle municipal and irrigation right A017002 | Water right | 60,000 acre-ft/year | Permitted | 21 km |
| Arroyo Valle municipal and irrigation right A017003 | Water right | 60,000 acre-ft/year | Permitted | 21 km |
| Pleasanton Plant | Mine | — | Operating | 23 km |
| Russell City Energy Center | Power plant | 655 MW | Operating | 24 km |
| Stevens Creek Quarry | Mine | — | Operating | 25 km |
| Lawrence Livermore NL Lassen Phase 1 | AI supercomputer | 173 H100e | Operating | 29 km |
| Lawrence Livermore NL Lassen Phase 2 | AI supercomputer | 200 H100e | Operating | 29 km |
Operator and place
More from Hurricane Electric
- Hurricane Electric Fremont 2data center
Other data centers in California
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- eWRIMS Water Rights List. eWRIMS Water Rights List, Public domain.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.