Data center · England, United Kingdom
Equinix LD8
Equinix LD8 is a data center in England, United Kingdom, operated by Equinix, Inc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 8-9 Harbour Exchange Square, London, E14 9HF | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Equinix, Inc. | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 4,170 m² (site outline, 4,170 m² of buildings, 2 buildings) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.4982, -0.0149 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Equinix, Inc. operates 13 of the 191 data centers in the United Kingdom in our data with a named owner; the most of any owner. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United Kingdom | Rank | Data centers | Share |
|---|---|---|---|
| Equinix, Inc. | 1st | 13 | 6.8% |
| Digital Realty | 2nd | 10 | 5.2% |
| Virtus | 2nd | 10 | 5.2% |
| Pulsant | 4th | 8 | 4.2% |
| NTT Limited | 5th | 6 | 3.1% |
Nearby
Within 50 km of this data center: 365 power plants (123 operating, 2,104 MW), 82 substations, 36 grid connections (22 operating, 233 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hedgehog Grove Solar Farm - Solar Panels | Power plant | 98 MW | Planned | 0.5 km |
| The O2 Arena - Wind turbines | Power plant | 3 MW | Permitted | 1.7 km |
| Alcatel, Telegraph House - Solar Panels | Power plant | 1.3 MW | Cancelled | 2.0 km |
| Tertiary Study grid connection | Grid connection | 57 MW | Planned | 5.7 km |
| Solar 6.935 MW grid connection at Maiden Newton | Grid connection | 6.94 MW | Operating | 6.1 km |
| North London (Electricity Line) Reinforcement | Transmission line | — | Permitted | 12 km |
| Ariel Way White City London grid connection | Grid connection | 2.2 MW | Operating | 14 km |
| Goldsmiths Primary | Substation | — | — | 17 km |
| Volt Avenue Primary | Substation | — | — | 17 km |
Operator and place
More from Equinix, Inc.
- Equinix AM1data center
- Equinix MA1data center
- Equinix MA4data center
- Equinix Amsterdam AM5data center
- Equinix AM6data center
- Equinix Helsinki HE3data center
- Equinix Helsinki HE4data center
- Equinix MU1data center
Other data centers in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.